Product

H₂-SPU

Hydrogen Shore Power Unit

A modular hydrogen shore power unit for container terminals, used off-grid or alongside a limited grid connection.

Status: Feasibility study

Isometric drawing of a container terminal with two vessels at the quay and a shore power cable along the quay; a close-up shows the H₂-SPU container next to two hydrogen containers

The challenge

Under the EU’s AFIR regulation, ports in the TEN-T network must be able to supply shore power for at least 90% of calls by container ships above 5,000 GT from 2030. In practice, it is the terminals that have to provide it. In many ports, grid congestion makes it difficult or slow to obtain the required grid capacity. A full grid connection is also expensive. We expect the H₂-SPU to supply shore power for less than half the CAPEX of a full grid connection.

How it works

The H₂-SPU is a further development of the HAP-RM. Fuel cells, a battery and power electronics are combined in a container on the terminal.

  • Hydrogen supply: hydrogen is delivered in swappable 20 or 40 ft containers that are exchanged by truck.
  • Fuel cells and battery: the fuel cells supply the base load, the battery absorbs the peaks.
  • Power electronics: power conditioning delivers the voltage and frequency the vessel requires, for low-voltage or high-voltage shore connections.
  • Off-grid or hybrid: the unit can operate off-grid, offering full autonomy, or alongside a limited grid connection, supplying what the grid cannot.

The system is modular: capacity can be expanded by adding fuel cell and battery modules.

Key figures

Power
Modular, from approx. 0.5 MVA to several MVA per terminal
Fuel cell modules
250 kW each
Shore connection
Low voltage (400–690 V) or high voltage (6.6 kV)
Operation
Off-grid or hybrid with grid connection

Status

Together with Rotterdam Shortsea Terminals, we are carrying out a feasibility study into hybrid shore power with the H₂-SPU. The study is supported by the Smart Energy Systems subsidy scheme of the City of Rotterdam and will result in a proposal for a pilot installation.

Facing shore power requirements at your terminal? Contact us to explore what the H₂-SPU can do.